Unit 12 Tender & Procurement Assignment Brief
| Qualification | Pearson BTEC Higher Nationals Construction |
| Unit Number | 12 |
| Unit Title | Tender & Procurement |
| Unit code | M/618/8091 |
| Unit level | 4 |
| Credit value | 15 |
Introduction
For a client, the process of procurement – obtaining the services of a main contractor to construct their project – is often complex. The selection of a contractor that will meet the client’s expectations is essential so that time, quality and cost constraints are met, with no delays, overruns or budgets exceeded. Tendering is the process of obtaining a price for the designed and specified works. The importance of contractor selection to the successful completion of a client’s project cannot be overstated. This unit aims to give students the knowledge they need to be able to select a procurement route and an appropriate tendering method in the awarding of a project to a main contractor. Students will learn how to prepare a tender package in procuring a contractor for a client’s work. Many different procurement methods are available to achieve this: from open to closed systems.
Topics included in this unit are: tendering constraints and information; the documentation needed to send out a tender; the factors that affect procurement; the procurement methods that can be used to select a contractor.
On successful completion of this unit, students will be able to prepare tender documents for a client’s project, at the design stage, using a suitable procurement method. Students will also have the fundamental knowledge and skills needed to progress to a higher level of study.
Learning Outcomes
By the end of this unit, students will be able to:
LO1 Define what constitutes a tender and the information required for this process
LO2 Explain the procedures and contractual arrangements for tendering
LO3 Analyse the factors that affect the selection of construction procurement methods
LO4 Prepare tender documentation for a given project.
Essential Content
LO1 Define what constitutes a tender and the information required for this process
Information required to produce a tender
Decision to tender
Preliminary information received
Type of client or stakeholder (e.g., private or commercial clients)
Stage of the design drawings
Provisional timescale
Pre-contract health and safety plans
Tender resource allocations
Electronic or hardcopy tender process
Type of work
Capacity to tender
Constraints on tendering
Time allocated to the compilation of tender documentation
Selection of list of tenderers
Allocated tendering time
Return date and time
Resource implications in terms of hardcopy
Poor tender presentation (e.g., insufficient information sent out to contractors) Revisions to design
Tender documentation
Covering invitation letter
Form of tender
Employers’ requirements
Nominated and named contractors Tender submission breakdown
List of drawings
Drawings/data (e.g., design drawings, tender drawings, building information model data)
Specifications
Bill of quantities
Preliminaries
Pre-construction information
Contract information (e.g., form of contract to be used on the project, contract conditions and terms)
Tender documents (e.g., tender pricing document, tender return instructions, tender return envelope)
References to any code of practice for tendering procedures
LO2 Explain the procedures and contractual arrangements for tendering
Tendering stages
Decision to tender
Tender preparation strategy
Tendering arrangements
Pre-qualification questionnaire
Compiling lists of prospective tenderers
Selection criteria (e.g., experience, references, professional association status, ISO registration, recommendations, clients, preferences, interview, presentation, financial accounts, health and safety record, rotation on a select list, listing against financial capacity, previous performance feedback)
Types of tender
Open
Selective
Negotiated
Serial
Framework tendering
Single-stage and two-stage
Advantages and disadvantages
Criteria for the selection of type of contract
Types of contract/procurement (e.g., traditional, design and build, construction management, measured term)
Standard forms of contract (e.g., Joint Contracts Tribunal (JCT), New Engineering Contract (NEC), FIDIC, International Construction Contracts) Level of information provided at tendering stage
Criteria for the selection of tendering method
Type of contract
Size of project
Financial costs
LO3 Analyse the factors that affect the selection of construction procurement methods
Forms of procurement
Traditional (e.g., design-bid-build, bid-build, employer-designed)
Design and build (e.g., single-stage, two-stage)
Management
Private Finance Initiative (e.g., Build-own-operate-transfer (BOOT),
Design-build-finance-maintain (DBFM), Design-build-finance-transfer (DBFT))
Engineering procurement and construction (EPC)
Engineering procurement and construction management (EPCM)
Framework agreements Others
Issues associated with procurement of projects
Current issues (associated with procurement and contractual arrangements)
Government policy and strategy
Professional body requirements
Contract organisations (e.g., JCT, NEC, FIDIC)
Differences between public and private procurement
Industry developments and trends (e.g., building information modelling, digital asset management)
International trade agreements
Factors affecting procurement routes
Time constraints
Financial constraints (budget, costs and financial planning)
Quality
Client characteristics (e.g., government, institutional, private sector)
Project characteristics
Level of risk associated (e.g., apportionment of risk between client and contractor)
Environmental/sustainability
Stage of the design (e.g., fully designed, partially designed)
Complexity of project
Regulatory/legislation compliance
LO4 Prepare tender documentation for a given project
Project parameters
Client’s budget
Client’s agreed procurement strategy
Project management strategy
Available procurement time in relation to design stage
Construction information availability schedule
Level of specified quality
Policy/political constraints
Value for money
Level of client knowledge.
Contract type in relation to method of procurement
Tender documentation
Letter of invitation
Form of tender
Preliminaries (e.g., pre-construction information, site waste management plan) Form of contract
Tender pricing document
Employer’s information requirements for BIM
Drawings
Specifications Tender return slip
Learning Outcomes and Assessment Criteria
| Pass | Merit | Distinction |
| LO1 Define what constitutes a tender and the information required for this process |
D1 Analyse the potential benefits of Building Information Modelling (BIM) in the tender process. |
|
| P1 Explain the information required to be produced prior to tendering.
P2 Illustrate the documentation required to formulate a tender for a major project. |
M1 Compare the use of specifications and bills of quantities as tendering methods used for a privately funded project. | |
| LO2 Explain the procedures and contractual arrangements for tendering |
D2 Justify the selection of a contract type for a given form of tender. |
|
| P3 Explain the stages of a tender process and the criteria used in selecting tenders.
P4 Discuss the advantages and disadvantages of different types of tender for a given project. |
M2 Compare the different types of tendering available for a design and build project. | |
| LO3 Analyse the factors that affect the selection of construction procurement methods |
D3 Evaluate the relationship between procurement route, contract type and tender process in limiting risk for client and contractor. |
|
| P5 Explore the professional, legal and industry issues that influence procurement.
P6 Explain the project factors that inform the selection of a procurement route. |
M3 Analyse the different influences on procurement between public and private projects. | |
| LO4 Prepare tender documentation for a given project | ||
| P7 Compile project parameters, to inform tender documentation, for a given project.
P8 Produce tender documentation (based on drawings and specifications provided by others) for a given project. |
M4 Justify the approach to tender documentation in relation to the client’s agreed procurement strategy. | |